Framing is Up

Framing is up on the bathroom and front wall! The ADU is starting to take shape.

This frame is where the garage door used to be

This frame is where the garage door used to be

The exterior of the bathroom

The exterior of the bathroom

IMG_7135.jpg
IMG_7125.jpg
Posted on October 30, 2019 .